Hi,
I wish to add a double socket in a cellar room under kitchen. There is an existing power cable passing through the cellar which is a radial supplying just two sockets in the kitchen above. I was told that by an NICEIC registered guy who installed a dual RCD distribution board last year. It's also such a simple circuit that it's plain to see.
I was considering breaking into this cable in the cellar to provide a new double socket down there.
At no point will any work be carried out in the kitchen.
I know this is on the cusp of being notifiable, but this would seem to be:
"Work that is not in a kitchen or special location and does not involve a special installation"
Am I right in assuming this is not notifiable?
Thanks.
I wish to add a double socket in a cellar room under kitchen. There is an existing power cable passing through the cellar which is a radial supplying just two sockets in the kitchen above. I was told that by an NICEIC registered guy who installed a dual RCD distribution board last year. It's also such a simple circuit that it's plain to see.
I was considering breaking into this cable in the cellar to provide a new double socket down there.
At no point will any work be carried out in the kitchen.
I know this is on the cusp of being notifiable, but this would seem to be:
"Work that is not in a kitchen or special location and does not involve a special installation"
Am I right in assuming this is not notifiable?
Thanks.