Hello, I have no one to ask so I'm hoping someone can help a me out. I have wet underfloor heating throughout my groundfloor 100sqm. Celotex underneath, then the heating pipes then it was screeded. It was dry screed (think that's what you call it - it wasn't liquid). I have chosen 1.2m x 0.6m tiles. The tile supplier said to lay anti crack matting under the tiles however, the two tilers I've spoken to have said no so long as there's no gaps in the adhesive it should be fine. What should I do? Use anti crack matting or not?