This weekend I'll be laying a concrete shed base. I've prepared the shuttering but because the land is slopping, two sides of the shuttering are 100mm deep whareas the other two sides are anything up to 200mm deep. Will I be ok to fill the whole area with concrete or is it essential to first fill the deeper areas with hardcore. The shed is the metal variety with no base. Thanks in advance.