Hi, I have a problem. My builder offered to put up the tiles in my bathroom - on all four walls. I don't do DIY but I was expecting the following:
a) he would measure the walls and plot out the tiles so as to have an equal sixed tile at top/bottom and left/right.
b) that he would spread the adhesive on with those comb like devices
What he has done is to start with a full tile at bath level and is putting the adhesive (very slowly) around the edges of the tile (25cm square tiles). Will this not leave the tiles with a gap behind them? Is that a problem? He's not done any cutting of tiles yet. Should I be worried,? (His other work has been OK so far but not as delicate - more in the line of making trapdoors and shelves etc)
Thanks for any advice.
a) he would measure the walls and plot out the tiles so as to have an equal sixed tile at top/bottom and left/right.
b) that he would spread the adhesive on with those comb like devices
What he has done is to start with a full tile at bath level and is putting the adhesive (very slowly) around the edges of the tile (25cm square tiles). Will this not leave the tiles with a gap behind them? Is that a problem? He's not done any cutting of tiles yet. Should I be worried,? (His other work has been OK so far but not as delicate - more in the line of making trapdoors and shelves etc)
Thanks for any advice.