- Joined
- 13 Feb 2009
- Messages
- 131
- Reaction score
- 3
- Country
Had reclaimed plain concrete tiles and lead valley work completed to a small extension yesterday, noticed a fair size gap (3 inch) between tiles overhanging valley and lead gutter - can someone advise if this is all ok, before I pay for the job! many thanks in advance, pics attached:
Should there be a fillet under the lead where the tiles overhang? or should the gap between tiles and lead be packed with mortar?
Should there be a fillet under the lead where the tiles overhang? or should the gap between tiles and lead be packed with mortar?