Hi guys I need advice on how to join a 40mm 1.5" plastic waste pipe to a cast iron stack, the stack runs through the bathroom and I will need to replace the exsisting waste from the bath which is copper as you can see from the pic, would you think its better off to run the new plastic waste right up to the cast stack instead of bossing it and using a straight connector?
any help would be appreciated,
thanks in advance!
any help would be appreciated,
thanks in advance!