Hi,
My house has a Juliet balcony which is constructed from the internal joists that then extend out of the house acting as a cantilever on the external blockwork.
This balcony needs some work and I'll basically be rebuilding all of the box section it and re-treating and then weather painting the joists.
Are there any UK regulations about cantilever distances when built this way? I've had a google and all of the resources I've found have been for the US market.
the joists are 2x8s and I'll be replacing anything i am not keeping with C24 2x8 timber.
Cheers
My house has a Juliet balcony which is constructed from the internal joists that then extend out of the house acting as a cantilever on the external blockwork.
This balcony needs some work and I'll basically be rebuilding all of the box section it and re-treating and then weather painting the joists.
Are there any UK regulations about cantilever distances when built this way? I've had a google and all of the resources I've found have been for the US market.
the joists are 2x8s and I'll be replacing anything i am not keeping with C24 2x8 timber.
Cheers