Hi guys, I have been reading the posts on bonding and i just wanted to check that i have it right.
I have a gable end wall,inside, which i intend to plaster. I have coated it yesterday with a pva 4-1 mix and let the wall take as much as it could. I am now about to give it a second coat of pva with a 3-1 mix.
while still tacky, within 4 hours, i will apply a first coat of bonding. when this coat has set ,another 4 hours?, i can apply a second coat. then in the morning i can apply the coat of plaster.
is the above correct?
do i need to wait more than four hours between coats of bonding?
do i need to do the second coat of bonding when the first has darkened(set)
is it ok to wait overnight after second coat of bonding before i plaster?
when will it be ok to paint the final coat of plaster, a day? a week?
thanks for the help.
I have a gable end wall,inside, which i intend to plaster. I have coated it yesterday with a pva 4-1 mix and let the wall take as much as it could. I am now about to give it a second coat of pva with a 3-1 mix.
while still tacky, within 4 hours, i will apply a first coat of bonding. when this coat has set ,another 4 hours?, i can apply a second coat. then in the morning i can apply the coat of plaster.
is the above correct?
do i need to wait more than four hours between coats of bonding?
do i need to do the second coat of bonding when the first has darkened(set)
is it ok to wait overnight after second coat of bonding before i plaster?
when will it be ok to paint the final coat of plaster, a day? a week?
thanks for the help.