Over time we've been progresing the back garden from the overgrown weed area to into something that can be played on.
The garden area is 5.5mtrs x 3.4mtrs which we have dug over, killed the weeds, rough hand sorted the stones and large roots from the mud and kinda levelled it off.
We planted grass seed by spiking ground with fork, and raking seed in. So far half of it is growing but the soil is uneven.
We were thinking if digging the top layer off again, adding in 2 tons of toil soil, leveling the garden again and go with putting turf down.
Whole thing should take about a full day.
I dont think 1cubic metre of soil would cover the area we need once packed down.
We could carry on with the seeding and in 9-10months we maybe able to cut the grass if its thick enough.
What you think?
The grass is growing, its through the mud about about 1.5cm high in areas. Just very thin in areas, will supply a picture when ive filled the tree hole in, and levelled the bottom bit.
The garden area is 5.5mtrs x 3.4mtrs which we have dug over, killed the weeds, rough hand sorted the stones and large roots from the mud and kinda levelled it off.
We planted grass seed by spiking ground with fork, and raking seed in. So far half of it is growing but the soil is uneven.
We were thinking if digging the top layer off again, adding in 2 tons of toil soil, leveling the garden again and go with putting turf down.
Whole thing should take about a full day.
I dont think 1cubic metre of soil would cover the area we need once packed down.
We could carry on with the seeding and in 9-10months we maybe able to cut the grass if its thick enough.
What you think?
The grass is growing, its through the mud about about 1.5cm high in areas. Just very thin in areas, will supply a picture when ive filled the tree hole in, and levelled the bottom bit.