- Joined
- 3 Apr 2006
- Messages
- 88
- Reaction score
- 0
- Country
the contractor i have hired to do my driveway has already laid the hardcore and concrete in without laying any string across to create neat lines.
isn't it standard procedure to peg out the entire driveway first using string so you can determine the finished level to make sure the drive will be as flat as possible?
isn't it standard procedure to peg out the entire driveway first using string so you can determine the finished level to make sure the drive will be as flat as possible?