Hi All
Having a patio laid and the guy doing it has pulled up the concrete that was there and laid type 1 hardcore down to the level it was. Now he's laid the patio and it's blocking an air vent that is in flowing into the house.
The dam proof course is at the top of the vent, therefore the patio is level with the DPC.
1) Is it ok for the vent to be covered, or a gap left there or should it be completely free meaning the patio needs to be lowered?
2) Is it ok for the patio to be level with the DPC or should it be lower? Is there any regs for this?
Thanks
Having a patio laid and the guy doing it has pulled up the concrete that was there and laid type 1 hardcore down to the level it was. Now he's laid the patio and it's blocking an air vent that is in flowing into the house.
The dam proof course is at the top of the vent, therefore the patio is level with the DPC.
1) Is it ok for the vent to be covered, or a gap left there or should it be completely free meaning the patio needs to be lowered?
2) Is it ok for the patio to be level with the DPC or should it be lower? Is there any regs for this?
Thanks