First time posting.
I am putting a sleeper wall in just a small one 500mm high. I have poured concrete footings and have sank rebar into it to thread the sleepers in nd chemical resin to bond them. problem is part on the pour is not completely level. can I use a mortar bed to sit the sleepers on to make it 100% Level?
Advice much appriciated