Laying concrete floors over different sub base?

Joined
12 Oct 2012
Messages
134
Reaction score
3
Location
Belfast
Country
United Kingdom
#Edit- reposted in building#

Hello

Having finally removed all the suspended timber floors we have discovered a mixture of sub bases in the void.

2 rooms + hall way are just soil and the remaining rooms have a thin concrete oversite. Now i have a couple of questions on how to proceed.

Is it ok to pack rubble/fill in on top of the bare soil? (Sand/DPM/slab/insul/VCL/screed to follow)

Would i be better breaking up the exisiting oversite concrete and compact the whole lot?

The rooms with soil will need approx 500mm of fill and the other rooms just 200mm.

Thanks for any info.

Cheers Neil
 
Sponsored Links
If you are planning to have a solid concrete floor as you finished floor level you will bridge your existing dampcourse and will have to install a new one.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top