Hi I am erecting a upvc conservatory with a georgan roof style. The house walls are good quality pebble dash which I am chasing back to blockwork to fix upvc frames to. If I am chasing back for the roof plates then re-render/pebbledash do I need lead flashing under the pebble dash and onto the frame. My thinking is that making good with pebbledash up to the roof plate, the water will not be able to seep behind the roof plate as it will be covered in render/pebbledash. Hope this makes sense. Cheers