Hi all,
I have extended my kitchen and now need to move my water main as it comes up in the middle of my kitchen now. The pipe is lead and joins to 15mm copper to main stop tap. I need to remove the small amount of copper before the stop tap to enable me to lower the pipe to extend it under the floor joists. How easy is lead to join to copper? I know in an ideal world I would run a new blue pipe back out to stop tap in road but I want to avoid digging up my front garden.
Also my incoming supply is only 15mm to stop tap and the pipe work running up to my bath is 22mm. Is the 22mm really any use if the pipes before it are only 15mm? The reason I ask as this also needs relocating.
I can so basic plumbing by the way... Well kinda [/list]
I have extended my kitchen and now need to move my water main as it comes up in the middle of my kitchen now. The pipe is lead and joins to 15mm copper to main stop tap. I need to remove the small amount of copper before the stop tap to enable me to lower the pipe to extend it under the floor joists. How easy is lead to join to copper? I know in an ideal world I would run a new blue pipe back out to stop tap in road but I want to avoid digging up my front garden.
Also my incoming supply is only 15mm to stop tap and the pipe work running up to my bath is 22mm. Is the 22mm really any use if the pipes before it are only 15mm? The reason I ask as this also needs relocating.
I can so basic plumbing by the way... Well kinda [/list]