Hi am helping a friend who has a project under way. He has planned a re -positioned kitchen. This means a branch run for sink/washing machine waste to a soil pipe fitted with an air admittance valve. Query is the run will be in 40 mm and about 4.5 meters from soil pipe. Am i right in thinking the maximum branch for 40mm is 3 meters,, Will building regs worry about this or is there an alternative. Thanks.