Hi there, after some advice if I may. I’m a bit naive when it comes to this.
Had an architect draw up some plans for a simple single story lean-to extension which was approved and now moving on to “detailed drawings” which as I understand are what will be used for building control and presumably construction.
I mentioned to the architect that we’d like certain design elements included such as “flush threshold” on some sliding/folding doors - and she said that those details can be decided on later when it comes to build. Does that sound right, I’d have assumed the “detailed drawings” would include details such as that? Or should I stop overthinking it and let them do their job?
Cheers
Had an architect draw up some plans for a simple single story lean-to extension which was approved and now moving on to “detailed drawings” which as I understand are what will be used for building control and presumably construction.
I mentioned to the architect that we’d like certain design elements included such as “flush threshold” on some sliding/folding doors - and she said that those details can be decided on later when it comes to build. Does that sound right, I’d have assumed the “detailed drawings” would include details such as that? Or should I stop overthinking it and let them do their job?
Cheers