levelling 2 concrete floors

Joined
23 Apr 2007
Messages
4
Reaction score
0
Location
Durham
Country
United Kingdom
2 rooms have been knocked into one but the extra room's floor is slightly higher 1.5" than the other can this be levelled by sand and cement screed or will the whole floor need re-laying if the screed is ok it will raise the kitchen floor and create a step into the kitchen from the hallway would the screed be strong enough to allow this and allow tiling on top afterwards or would the screed need supporting at the step edge? any help greatly appreciated thanks
 
Sponsored Links
DUPLICATE POST.. read the forum rules..

and why ask the same question 2 different ways within 5 mins of each other?
 
had problems with internet connection and explorer froze didn't think the first one actually posted properly sorry......... :oops:
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top