Hi, I will be installing a UB for the loft conversion that will be bearing on an internal wall. This wall has a doorway directly below where the UB will be bearing. The door is quite low (1800) so whilst I'm taking a few bricks out for the padstone I may as well take a few more out and raise the doorway to normal height, thus needing a new lintel.
The structural engineer has specified the padstone and I know the loading that the UB will be putting onto it.
Will the lintel need to have a load capacity to match the load put onto the padstone?
I have the loading calculations and concrete lintel manufacturers publish their max loadings, so as long as I understand it correctly I can easily justify the lintel to building control.
The structural engineer has specified the padstone and I know the loading that the UB will be putting onto it.
Will the lintel need to have a load capacity to match the load put onto the padstone?
I have the loading calculations and concrete lintel manufacturers publish their max loadings, so as long as I understand it correctly I can easily justify the lintel to building control.