I’m looking to add insulation to my loft. The joists are 125mm
Is there a problem with putting 100mm between the joists, and then 170mm on top?
Will the 25mm gap be an issue? I assume the top roll will probably settle and fill the gap?
Is there a problem with putting 100mm between the joists, and then 170mm on top?