Looking at getting my base done for a 5m x 4m log cabin in the next few weeks. I have just ripped up all flags from my front garden, so want to ask would it be suitable to dig down 100mm then smash up the flags (hardcore) then knock up some concrete and pour over. This would use all the hardcore I have and save on concrete cost. Would this be ok for a base ?
Thanks