I am moving my bathroom around and the waste from the bath will be about 5m from the stack i will have to surface mount the waste as the joist run in the wrong direction and i understand i cant cut through the joists. The regs say the max run for 40mm pipe is 3m can this be extended if i fit a AAV. Nothing else will be getting connected on this run apart from the bath also if i go up a pipe size i wont get the required fall