We are building a 2 story extension and are having a concrete floor in new kitchen and garage. We have put in the hardcore and are about to blind and cover with membrane. My question is this, when the lorry comes, to pour the concrete in, do we need to level it? or will it find its own level. Thanks for any advice
 
Sponsored Links
you need wood or another surface aroung the edges fixed as a datum point a long strait edge and lots of shoveling and zigzagging with the strait edge to push the excess and flatten the top
 
Sponsored Links
If you get the driver to mix it wet, then it will do most of the leveling itself. If it is too dry, you are in for some hard work.

Unless you are troweling it up as the finished floor, then I would not worry too much in getting it flat
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top