Hi everyone, I could do with some advice please

We recently had LVT (Camero) floor fitted, and noticed just before the bifold doors, the LVT droops down.

We pulled a bit up and could see that the screed that the builder put down stops about and inch and a half before the doors.

We have asked him for an explanation and he said it was normal practice incase we ever needed to have the bi-folds moved/repaired

It looks bloody awful and I cant imagine this is standard practice, can anyone tell me if this is true, or has he just done a sloppy job?

Thanks in advance!
 
Sponsored Links
As far as I know they have just glued it directly to the screed, I cannot see any sign of self levelling compound.
 
Sponsored Links
Is it Camaro loc or the glue down version ?

If glue down it should of had a smoothing compound done 1st. if loc then it should have a underlay.

can you post pics
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top