I need to know if internally a mains water pipe can be taken above ground to the comi boiler and serve the sink. The run would consist of some elbow joints and the total run of pipe is around 14 meters to the boiler.
I need to know if theres any disadvantages of having a mains water above ground as appose to below ground.
In a nut shell i need to know what options i have if my pipe ever went bust.
thanks in advance
I need to know if theres any disadvantages of having a mains water above ground as appose to below ground.
In a nut shell i need to know what options i have if my pipe ever went bust.
thanks in advance