I am about to lay a 100mm shed base using a cement:ballast ratio of 1:5.
First question.... Is that the recommended ratio?
Second question.... Because of limited access the ballast and cement will be delivered (Wickes) in 25 kg bags. Is the mixing process as simple as mixing 1 bag of cement with five bags of ballast (ie a weight ratio) or should I tip the contents into buckets so that the 1:5 ratio is measured by volume.
I can easily do both so which is the correct method??
Thanks in advance......
First question.... Is that the recommended ratio?
Second question.... Because of limited access the ballast and cement will be delivered (Wickes) in 25 kg bags. Is the mixing process as simple as mixing 1 bag of cement with five bags of ballast (ie a weight ratio) or should I tip the contents into buckets so that the 1:5 ratio is measured by volume.
I can easily do both so which is the correct method??
Thanks in advance......