We live in a 1960 - 1970 build house and planning to do the loft conversation.
We like to install a Megaflo or comb boiler so that we can get a good water pressure in our Loft. There will be total two bathrooms in the house and one W/C
The main water pipe coming in the house is undersized probably 15mm and we can't change the main pipe from the water meter as it supplies water to our neighbor as well.
I think the per minute water flow in the first floor toilet is 11L which is way below 20l/m recommendation.
What are our options? Can we replace the 15mm pipe half way through the main to our house then bring it all the way to loft? Or can we just replace the 15mm pipes in side the house?
Thank You
We like to install a Megaflo or comb boiler so that we can get a good water pressure in our Loft. There will be total two bathrooms in the house and one W/C
The main water pipe coming in the house is undersized probably 15mm and we can't change the main pipe from the water meter as it supplies water to our neighbor as well.
I think the per minute water flow in the first floor toilet is 11L which is way below 20l/m recommendation.
What are our options? Can we replace the 15mm pipe half way through the main to our house then bring it all the way to loft? Or can we just replace the 15mm pipes in side the house?
Thank You