I need to mix some screed up.
I've got half a big bag of sand left from when I did my patio, which I would like to use in the screed - the only problem is the sand has been outside since last summer.
The bag was folded over the sand and a couple of slabs were left on top (to stop cats more than anything!)
Anyway will the sand be too wet to use? Or will it be OK?
I was going to do a 3:1 sand to cement mix.
How wet should a screed mix be?
Also any ideas how much sand and cement I'll need? The bit to be filled it 1.5m x 1.9m x 65mm - so not very big.
And finally can you confirm that the screed can go straight on top of polystyrene insulation?
THANKS!
I've got half a big bag of sand left from when I did my patio, which I would like to use in the screed - the only problem is the sand has been outside since last summer.
The bag was folded over the sand and a couple of slabs were left on top (to stop cats more than anything!)
Anyway will the sand be too wet to use? Or will it be OK?
I was going to do a 3:1 sand to cement mix.
How wet should a screed mix be?
Also any ideas how much sand and cement I'll need? The bit to be filled it 1.5m x 1.9m x 65mm - so not very big.
And finally can you confirm that the screed can go straight on top of polystyrene insulation?
THANKS!