Still fully functional....
Main incommer into house, straight to the overhead wires. 3phase + PE-N
Aluminium wiring, 63A per phase rating max.
1 phase the insulation is burnt vapourised/missing, 10cm bare wire to terminal.
another phase insulation is burnt, 3cm bare.
It's only 20 years old, but "apparently" someone didn't fit the cover at the top to stop vermin making their way in.
Must have been nice and cosy in there, perhaps mice should be called snap crackle and pop.
Hopefully next month they will come and install the meter outside at the edge of the property and we'll be going underground under the road to the mast rather than overhead as it is now.
Main incommer into house, straight to the overhead wires. 3phase + PE-N
Aluminium wiring, 63A per phase rating max.
1 phase the insulation is burnt vapourised/missing, 10cm bare wire to terminal.
another phase insulation is burnt, 3cm bare.
It's only 20 years old, but "apparently" someone didn't fit the cover at the top to stop vermin making their way in.
Must have been nice and cosy in there, perhaps mice should be called snap crackle and pop.
Hopefully next month they will come and install the meter outside at the edge of the property and we'll be going underground under the road to the mast rather than overhead as it is now.