I have put down 100mm PIR boards ontop of a new concrete slab, some areas are fine but in others the boards have a lot of movement. Is it better to use sand underneath to level out or is it possible to fix in place with screws/washers? Over top will be a vapour control layer, underfloor heating and screed.
Thanks in advance
Thanks in advance