Hi all.. this is my first post, so please be nice!!
I just wanted some advice on moving a radiator, which will involve altering pipework etc.
I have an open system (tank in loft) - think i got that right...??
I need to remove the existing radiator from the bathroom and install a new one on the opposite wall. I have read some posts suggesting to use a pipe freezer so that I would not have to drain the system.
However, is this method recommended as I will be working on this area for a few days?
Would it be an idea to freeze the pipes where I am working, remove the radiator and valves, cap off the pipes and then refreeze at a later point when I intend to alter the pipe work? Although I would only have a short time to do this I believe?
Have also heard of a way of draining the water from the pipes near the radiator, and not have to drain the whole system.. but not too sure about this method
Would really appreciate some advice.
Thanks in advance..
I just wanted some advice on moving a radiator, which will involve altering pipework etc.
I have an open system (tank in loft) - think i got that right...??
I need to remove the existing radiator from the bathroom and install a new one on the opposite wall. I have read some posts suggesting to use a pipe freezer so that I would not have to drain the system.
However, is this method recommended as I will be working on this area for a few days?
Would it be an idea to freeze the pipes where I am working, remove the radiator and valves, cap off the pipes and then refreeze at a later point when I intend to alter the pipe work? Although I would only have a short time to do this I believe?
Have also heard of a way of draining the water from the pipes near the radiator, and not have to drain the whole system.. but not too sure about this method
Would really appreciate some advice.
Thanks in advance..