- Joined
- 15 Apr 2018
- Messages
- 268
- Reaction score
- 1
- Country
Hi all
I am renovating the bathroom and am using the Multipanel tile wall, a 3mm rigid laminate panel.
https://www.bodleeds.co.uk/multipan...large-format-embossed-wall-panel-167061-p.asp
I wondered what the best adhesive would be to use for this? ( hoping for something cheaper than the multipanel at £7 per tube.
Also whats the best saw/blade to use for cutting the length?
I did wonder about an Exakt 14 saw?
As its me, nothing is as simple as could be.
The bath is
https://victoriaplum.com/browse/fre...747698&utm_content=Baths > Freestanding baths
But in order for the shower screen not to cut across the window we are having to put a 10cm wide "ledge" between the wall and the bath. Due to the shape of the bath we are going to run this ledge along the whole wall ( means we can hide the basin pipework and also have the bath taps mounted to it)
I am undecided whether to have this ledge the same height as the bath ( maybe a few mm higher to be able to seal it)? or go for 10 or so cm above?
Any thoughts on that?
Thanks in advance
I am renovating the bathroom and am using the Multipanel tile wall, a 3mm rigid laminate panel.
https://www.bodleeds.co.uk/multipan...large-format-embossed-wall-panel-167061-p.asp
I wondered what the best adhesive would be to use for this? ( hoping for something cheaper than the multipanel at £7 per tube.
Also whats the best saw/blade to use for cutting the length?
I did wonder about an Exakt 14 saw?
As its me, nothing is as simple as could be.
The bath is
https://victoriaplum.com/browse/fre...747698&utm_content=Baths > Freestanding baths
But in order for the shower screen not to cut across the window we are having to put a 10cm wide "ledge" between the wall and the bath. Due to the shape of the bath we are going to run this ledge along the whole wall ( means we can hide the basin pipework and also have the bath taps mounted to it)
I am undecided whether to have this ledge the same height as the bath ( maybe a few mm higher to be able to seal it)? or go for 10 or so cm above?
Any thoughts on that?
Thanks in advance