My system is fitted with a Myson Aerjec II de-aerator and I am concerned that it has not been installed correctly.
It looks like this:
To loft
|
__|________
| |
| |
| |________ To Pump
| |
| |
|__________|
| |
| |
Boiler? Not used
I have looked at the diagrams in the Aerjec Installation Instructions on the Circulating Pumps website and they are nothing like this.
Does it need putting right or am I worrying unnecessarily?
[/img]
It looks like this:
To loft
|
__|________
| |
| |
| |________ To Pump
| |
| |
|__________|
| |
| |
Boiler? Not used
I have looked at the diagrams in the Aerjec Installation Instructions on the Circulating Pumps website and they are nothing like this.
Does it need putting right or am I worrying unnecessarily?
[/img]