I am installing a new bathroom with shower bath & will be running new H/C feed lines for a power shower from a 2 bar pump - we intend installing another en-suite shower at a later date. The house is mid 60’s & I’m pretty certain it hasn’t been touched since & so I am unsure about condition of existing plumbing. Rather than replace the bath sink runs separately, is it acceptable to tee off the pumped H/C shower runs to feed the bath & basin unit?