can anyone give me some advice
i have started work on my new driveway the retaining walls are in (site needs building up level with road) i have put some type 1 down but im still a distance of two bricks two low to the finished level to start laying the blocks i have two m/bags of sharp sand and two pallets of blocks the area is 5.5m x 3.5m how much more type 1 will i need to bring my level up before laying the sharp. im thinking two but don't want to be short.
thanks
i have started work on my new driveway the retaining walls are in (site needs building up level with road) i have put some type 1 down but im still a distance of two bricks two low to the finished level to start laying the blocks i have two m/bags of sharp sand and two pallets of blocks the area is 5.5m x 3.5m how much more type 1 will i need to bring my level up before laying the sharp. im thinking two but don't want to be short.
thanks