I had a new boiler flue fitted Saturda. It was definitely rushed. When the engineer had finished to my dissatisfaction he left without filling in the huge holes. 3 of them. Ive since had them done and paid for it to be done. Am I right in thinking the engineer should have done this as part of his job? Or no?