New Build WC line up

Joined
5 Jan 2003
Messages
12,883
Reaction score
217
Location
Essex
Country
United Kingdom
Waiting to hear from Anglia Water with the build/over near sewer agreement, they have said so far we can put the new build footing up to 300mm close to the sewer pipe and do away with the middle inspection chamber, what is the situation for the new build toilet connection, will it be above the existing sewer pipe and drop in from the top or take it straight to the front inspection chamber somehow?


http://www.docdroid.net/gez5/img-new.pdf.html
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top