new build

Joined
27 Jan 2004
Messages
375
Reaction score
0
Country
United Kingdom
Hi I have been asked to fit heating system in a large house approx 20 25 rads. the customer does not want pipes coming up from the floor, he would like them coming up behind the plasterboard wall then out horizontally to the rad valves.

Would it be ok to run the main pipe work in 22mm then spur off to the rads in 10mm that way I can get the pipe work behind the wall.
Or any other suggestions please

The system will be an unvented, condensing boiler approx 120,000 btu.

thanks all help greatly appreciated as this is a large job for me and a bit daunting.


Brian
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top