Hi,
Wondering what the best practice is when all new pipework and boiler is installed. Flush out system a few times using just water and then add inhibitor.
Or use a cleaner specifically designed for new installs, let it circulate, flush out, refill and then inhibitor.
Whats the general consensus amongst the professionals?