Good afternoon,
Looking for a bit of advice,
Going to screed a downstairs concrete bathroom floor prior to fitting with tiles, doesnt look to be any DPM down previously. So basically on top of the concrete floor, prior to screeding, I was going to put either a 'one coat' paste like one (potentially Ardex DPM 1C or similar), or a plastic membrance like one (capital valley plastics damp proof membrane or simlar).
If using the Ardex would this need to be primed prior to adding the screed (Mapei Ultraplan 3240 self levelling compound) and can i just put this down right on top of the Ardex?
If using the membrane would the screed actually take to this or would some sort of underlay etc be required?
Thanks
Looking for a bit of advice,
Going to screed a downstairs concrete bathroom floor prior to fitting with tiles, doesnt look to be any DPM down previously. So basically on top of the concrete floor, prior to screeding, I was going to put either a 'one coat' paste like one (potentially Ardex DPM 1C or similar), or a plastic membrance like one (capital valley plastics damp proof membrane or simlar).
If using the Ardex would this need to be primed prior to adding the screed (Mapei Ultraplan 3240 self levelling compound) and can i just put this down right on top of the Ardex?
If using the membrane would the screed actually take to this or would some sort of underlay etc be required?
Thanks