the kitchen project
KiTchen project started on the 28th of july 2007
As you can see here is pictures of the old kitchen.
The room is north facing , and their is only 1 small window.
We knew we wanted to get more light by knocking the wall down between the dining room and kitchen, thought its a supporting wall
view from the dining room looking against the supporting wall..
Supports where put in to hold the floor above while the wall was knocked down.
Walls where tracked and the kitchen was just about a kitchen!
Steal beam was put in, and in the background you can see the tracking on the wall for HDMI/video cables for tv. (what a mess the tracking device does!!)
HDMI cables are used for the computer, computer has a hdmi connection , and its split into 2, one going to living room tv and one to the above tv. Keyboard and mouse are bluetooth. so if
i want to surf on the internet, i can just go into the kitchen with keyboard and mouse and work away (another benefit of hdmi is one cable that sends down video and sound, so sound plays from computer to tv speakers)
Above took about 3 evenings to do everything
Eventaully the kitchen was moved under the stairs in the hall way!
Between 6th -10th august, electrician was in a few nights a week fixing, (it didnt help we where getting a new split load cosumer unit in, and there was fautlt with our electrics
gu10 spot lights put into kitchen and dining room.
It was to awakward for the electrician to come from the floor above.
so holes where punched and cables fed across.
13th and 14th august
Next job was the plasterer's job to do his job
Steal Beam covered in plaster board, and painted and lights installed.
Next the painters turn.
He had to wait as long as possible for the plaster/skimmed walls to dry , deadline was the 27th (day kitchen fitters to come to install)
24th and it was done.
25th i hung the tv on the wall
27th kitchen fitters at last!
At last! for nearly a month, we have been eating/breathing dust!
1st day
took approx 3 days to fit, and then they had to take templates for the granite (which took another 10 days)
big fridge install
oven installed
Hob and oven view
view of sink and dining room
Sink wth engravement
The black radiator(TM)!
The mrs works for vauxhall dealership, the radiator was purchased as a white radiator from screw fix, we got it professsionally sprayed black (backed in the oven)
The exact colour is a vauxhall metallic black colour.
heres a zoom in on the metallic black
Sink with engravement
The final view so far! (just need door put on to utility room , skirting round other door , and splash back to be fitted.
KiTchen project started on the 28th of july 2007
As you can see here is pictures of the old kitchen.
The room is north facing , and their is only 1 small window.
We knew we wanted to get more light by knocking the wall down between the dining room and kitchen, thought its a supporting wall
view from the dining room looking against the supporting wall..
Supports where put in to hold the floor above while the wall was knocked down.
Walls where tracked and the kitchen was just about a kitchen!
Steal beam was put in, and in the background you can see the tracking on the wall for HDMI/video cables for tv. (what a mess the tracking device does!!)
HDMI cables are used for the computer, computer has a hdmi connection , and its split into 2, one going to living room tv and one to the above tv. Keyboard and mouse are bluetooth. so if
i want to surf on the internet, i can just go into the kitchen with keyboard and mouse and work away (another benefit of hdmi is one cable that sends down video and sound, so sound plays from computer to tv speakers)
Above took about 3 evenings to do everything
Eventaully the kitchen was moved under the stairs in the hall way!
Between 6th -10th august, electrician was in a few nights a week fixing, (it didnt help we where getting a new split load cosumer unit in, and there was fautlt with our electrics
gu10 spot lights put into kitchen and dining room.
It was to awakward for the electrician to come from the floor above.
so holes where punched and cables fed across.
13th and 14th august
Next job was the plasterer's job to do his job
Steal Beam covered in plaster board, and painted and lights installed.
Next the painters turn.
He had to wait as long as possible for the plaster/skimmed walls to dry , deadline was the 27th (day kitchen fitters to come to install)
24th and it was done.
25th i hung the tv on the wall
27th kitchen fitters at last!
At last! for nearly a month, we have been eating/breathing dust!
1st day
took approx 3 days to fit, and then they had to take templates for the granite (which took another 10 days)
big fridge install
oven installed
Hob and oven view
view of sink and dining room
Sink wth engravement
The black radiator(TM)!
The mrs works for vauxhall dealership, the radiator was purchased as a white radiator from screw fix, we got it professsionally sprayed black (backed in the oven)
The exact colour is a vauxhall metallic black colour.
heres a zoom in on the metallic black
Sink with engravement
The final view so far! (just need door put on to utility room , skirting round other door , and splash back to be fitted.