As it states really.
Can I use the existing pebbles on my patio (Approx 20mm diameter) to backfill the area after I’ve excavated the soil? I’ll be addding some MOT on top and compacting as well.
Can I use the existing pebbles on my patio (Approx 20mm diameter) to backfill the area after I’ve excavated the soil? I’ll be addding some MOT on top and compacting as well.