HI there this is my first project and first post so please be gentle.
We are in the process of buying a structurally sound chalet bungalow, 2 beds,lounge, dining room etc. The previous occupant kept it in good nick but it needs new everything and I would like to put on a conservatory (from the kitchen) and possibly an ensuite upstairs (dorma extension needed).
It has a working back boiler but would like to replace with a combi. I think the electrics may need a look at too.
The big question is what is the best order to do the renovations in? I am terrified I have bitten off more than I can chew after convincing my hubby what a great idea it is (he works 12 hour days in London so can't do too much to the house himself).
To top it off I am due to have a baby soon so want to get as much organised before he arrives!
We are in the process of buying a structurally sound chalet bungalow, 2 beds,lounge, dining room etc. The previous occupant kept it in good nick but it needs new everything and I would like to put on a conservatory (from the kitchen) and possibly an ensuite upstairs (dorma extension needed).
It has a working back boiler but would like to replace with a combi. I think the electrics may need a look at too.
The big question is what is the best order to do the renovations in? I am terrified I have bitten off more than I can chew after convincing my hubby what a great idea it is (he works 12 hour days in London so can't do too much to the house himself).
To top it off I am due to have a baby soon so want to get as much organised before he arrives!