Hi guys,
I'm a long time lurker but just signed up today. I recently laid a patio in the garden roughly 20m2. Laid on a 4:1 sand cement full bed. I now need to point but I'm really unsure on the best way to do this.
I'm fairly component at most DIY things but I've never done paving/pointing etc before.
I'm planning on using a 3:1 mix of sharp and cement then trowel into the gaps, compress and then smooth. My concern with this is the time it's going to take me. It's a big area and I don't want to spend weeks doing it. How long should it take?
I keep being told about resin based products but I have plenty of sharp and cement left so would rather use that.
Any advice would be welcomed!
Thanks.
I'm a long time lurker but just signed up today. I recently laid a patio in the garden roughly 20m2. Laid on a 4:1 sand cement full bed. I now need to point but I'm really unsure on the best way to do this.
I'm fairly component at most DIY things but I've never done paving/pointing etc before.
I'm planning on using a 3:1 mix of sharp and cement then trowel into the gaps, compress and then smooth. My concern with this is the time it's going to take me. It's a big area and I don't want to spend weeks doing it. How long should it take?
I keep being told about resin based products but I have plenty of sharp and cement left so would rather use that.
Any advice would be welcomed!
Thanks.