I need to move the mains cable that runs across our property to feed next door. At the moment it connects to our gable wall and then runs along the facia board at the back of the building but it is going to be in the way of a new rear extension. I am proposing to bury it in ducting from the pole on one boundry along the back of the house to the part line where the local electricty board will then take it back up the wall and re-connect it to the cable on the neibours facia. My question is at what level should the ducting interscet the new footings. Options as I see it.
1.Go along at the required depth then dive down to go under the footings.
2. Just keep going at the same depth and pour the footings around the duct.
3.Sit on top of the footings and then be briged by a couple of short lintels in the first course of blockwork.
TIA Cy.
1.Go along at the required depth then dive down to go under the footings.
2. Just keep going at the same depth and pour the footings around the duct.
3.Sit on top of the footings and then be briged by a couple of short lintels in the first course of blockwork.
TIA Cy.