- Joined
- 7 Feb 2008
- Messages
- 206
- Reaction score
- 6
- Country
The in-laws want me to run a few slabs along the side of their hot tub. The tub stands on a concrete slab which is 150mm deep.
As I have learnt from this site the correct method would be to use a wacker plate to compact MOT Type 1 to a depth of around 75mm, however;
1/. Jewsons tell me they only sell MOT Type 1 in the big jumbo bags
2/. I can't justify hiring a wacker plate for just a few slabs
Any ideas?
Many thanks.
As I have learnt from this site the correct method would be to use a wacker plate to compact MOT Type 1 to a depth of around 75mm, however;
1/. Jewsons tell me they only sell MOT Type 1 in the big jumbo bags
2/. I can't justify hiring a wacker plate for just a few slabs
Any ideas?
Many thanks.