Right folks, in an attempt to save time and money, I'm thinking about boarding over the old larved ceilings and having them plastered.
The pros are,
the old ceilings are cracked in places
I wouldnt trust the old fixingsenough to just plaster over the old, so new boards would = more fixings
Saves time stripping the old stuff and less mess
better sound proofing?
The cons are
I worry that its a bodge up
the thickness of the ceiling concerns me
ripping out the old exposes the plumbing and electrics so we can inspect them from below, instead of ripping the floorboards up
Just like to know what you lads think,have I missed anything out?
The pros are,
the old ceilings are cracked in places
I wouldnt trust the old fixingsenough to just plaster over the old, so new boards would = more fixings
Saves time stripping the old stuff and less mess
better sound proofing?
The cons are
I worry that its a bodge up
the thickness of the ceiling concerns me
ripping out the old exposes the plumbing and electrics so we can inspect them from below, instead of ripping the floorboards up
Just like to know what you lads think,have I missed anything out?