T
troweladdict
setting out slabs over a old concrete base
im i right in thinking to clean and wet the base then its a soild bed of morter say 4/1 mix of building sand and cement with a dash of water proofer in the mix and as im laying them too wet the back of the slabs as i lay them its a but to but job i meen no pointing will this be ok then lads
im i right in thinking to clean and wet the base then its a soild bed of morter say 4/1 mix of building sand and cement with a dash of water proofer in the mix and as im laying them too wet the back of the slabs as i lay them its a but to but job i meen no pointing will this be ok then lads