Just after some general advice including part p regs
I have an existing light on the front porch connected to switch in hallway. Missus wanted two wall lights instead - simply i'm wanting to remove existing light, drop in junction box, two short runs of T&E to the new wall lights either side of the front door (25w each)! Drilling through walls not an option.
As far as part p goes as of April 2013 i'm allowed to f**k up my outside electrics to my hearts delight with notifying anyone? Have I got this right?
Ta muchly
Just after some general advice including part p regs
I have an existing light on the front porch connected to switch in hallway. Missus wanted two wall lights instead - simply i'm wanting to remove existing light, drop in junction box, two short runs of T&E to the new wall lights either side of the front door (25w each)! Drilling through walls not an option.
As far as part p goes as of April 2013 i'm allowed to f**k up my outside electrics to my hearts delight with notifying anyone? Have I got this right?