i have just laid a new concrete path in my back garden. however i first had to renew the old clay drain and put in plastic. i bought a tick chamber from wickes with a universal adapter to fit plastic pipe to clay, i also got a two way 45 deg joint a 10 deg one way joint, a square drain and i set them in my new path. i now know i should have tried before i concreted it in. we had some heavy rain recently and my new drain just overflowed and ran all over the path.
have i set it too low? or too high? because i had to go on the line of the clay pipe have i used the wrong type of chamber? can anyone help?
have i set it too low? or too high? because i had to go on the line of the clay pipe have i used the wrong type of chamber? can anyone help?